Is it possible smart to tile over expansion joints on a basement concrete floor.
Vinyl tile over concrete expansion joint.
For tile over concrete the curing of the concrete places the tile under compression.
My thought was to fill the joints with level quick then to put red guard over top then use a membrane additive with the adhesive.
Make sure the concrete is dry and avoid self leveling patches.
Lay the first row of vinyl plank flooring along the wall leaving the manufacturer recommended amount of expansion space between the plank s edge and the wall usually about 1 4 inch.
Movement joints are used to join floorcoverings where expansion up to 1 5mm is required.
How to lay a vinyl tile floor vct flooring.
A basement is below grade and concrete below grade will almost always have moisture in it.
Designed specifically for use with flooring materials such as ceramic tile marble stone terrazzo and resins only.
If there are large expansion joints or cracks in your concrete you can fill and smooth them using premixed leveling products from home improvement stores.
The short answer is that you do not span control expansion joints with the tile.
The same floor patch you would use on wood floors should also work for concrete.
It also needs to be free of solvent wax grease oil paint and any other sealing compounds.
All profiles feature a perforated base for fixing are used to join floorcoverings where expansion is required.
When installing floating vinyl floors it is necessary to allow for this expansion by leaving a gap around the perimeter of the floor or anywhere it meets another floor or.
For the purpose of installing vinyl plank flooring the concrete does not have to be perfectly level only smooth.
Why do installations tent after a number of years.
They re not moisture prone it seems.
A single layer of tile allows any moisture in the concrete to escape through tile joints.
How long it takes tile to tent is directly a function of at least three variables the rate of concrete shrinkage the shear strength of the thinset and any expansive forces applied to the tile layer for.
When you place new tile over existing tile you cover the tile joints and cut off the escape route for the.
For installation of tile the tile ends at each control joint and the gap if filled with caulk rather than grout.
Large cracks and expansion joints should be filled and troweled smooth.
Vinyl is susceptible to temperature changes in its ambient environment which will cause the vinyl flooring to expand and contract with normal hot and cold fluctuations.