Depending on where the cut occurs it may be necessary to install utility trim inside the receiving pocket of the j channel or corner post that receives the vertical siding fig.
Vinyl siding j trim installation.
In applications using both soffit and fascia install frieze runner f trim on the bottom of fascia board and complete soffit installation.
For horizontal siding install f channel trim at the soffit and gable rake.
Install trim under eaves rakes.
At the bottoms of windows install under sill trim for horizontal siding and j channel trim for vertical siding.
J channel cut to length and installed on the ends by nailing into overhang and fitting into f trim and j channel supporting soffit panel.
To prevent the relatively thin panels from buckling observe these fitting and nailing rules.
You will also need to nail a strip of 1 2 inch 12 7 mm plywood 3 inches 76 2 mm wide to the channel to support it.
Find j channel vinyl siding trim at lowe s today.
Nail every 12 inches on center.
For vertical siding install j channel trim.
Gap at all ends.
If the top is mitered miter the sides as well.
Vinyl siding installation is designed to hang loosely on the sheathing so that it can expand and contract with temperature changes.
On hot days because the siding will contract when the temperature drops.
Finally caulk all trim where it meets doors windows.
If you have to cut the last row of siding you ll need to use a length of j channel on the top edge of the siding instead of utility trim.
To finish gable ends trim the gables with j channel cut each length of siding to match the slope of the roof and nail the siding in place.