Attach the starter strip to the plywood but don t nail it so tightly that it will restrict the strip s movement.
Vinyl siding first row.
Finally measure the distance from the first row to the deck top and cut the siding to fit over the deck.
Vinyl siding starter strips.
Once this happens it s only a matter of time before the wind catches them and sends them flying into the neighbor s yard.
Reverse the blade in the saw for extra smooth cutting through the vinyl and to.
Vinyl siding is installed with a channeling system in which the bottom of the first length of siding fits into an installed channel that holds the vinyl in place.
Continue to set panels in the first row always including the expansion gap.
Refresh your vinyl siding installation skills with best practices on areas including repair cleaning maintenance historic restoration and recycling lefto.
You need to leave at least 1 4.
Vinyl siding offers homeowners ease of maintenance and allows them to avoid painting the exterior of the home every few years.
Utility knife score panel with knife then bend the vinyl back and forth until it snaps cleanly on the scored line.
Whatever your measurement is take at least 1 4 or 1 8 on both sides for the panel to slide back and forth.
Power saw bench or radial arm saw use a fine tooth blade with slow cutting movements.
Get started installing vinyl siding with this video that covers wall preparation fasteners fastening techniques tools chalk lines corner posts and start.
This chalk line should be level and a consistent distance from the eaves or the top and bottom of the windows.
This keeps the panels locked together nice and tight.
Most vinyl siding failures are caused when panels unlock from each other.
Snap a level chalk line for the first starter strip at the base of the wall no less than 8 inches above ground level after determining the lowest corner of the house.
Aviation and tin snip start cutting at the top interlock and continue toward the bottom of the panel.
To secure this trimmed length nail j channel along the top of the deck backed by a strip.
When cutting vinyl siding it s usually to go into a corner.
If you don t cut your siding short when it expands in the summer it s going to buckle.
Nail the siding panel in place every 12 inches along the board with the same procedure as before.
Nail a piece of plywood about 3 5 inches 89 mm thick along the top of the chalk line this will hold out the bottom of the first row of siding.